Building the Hot Tub Deck, Steps & Railings
- Paul Robinson
- Feb 26
- 1 min read
With Oak Lodge taking shape, it's time to start building the deck for the hot tub. As everything here is on multiple levels, we had to get the deck level in all directions.

Typically we probably chose the wettest week and we were soon a foot deep in mud.
The base was then built, levelled and the deck cut and fitted. Using pallets, the hot tub was slid across slowly avoiding the ever growing mud.



Steps added before the railings.


Railings added, painted and the deck stained.

Just need the chimney, attach the burner, build the step, add lighting and gravel and you've a hot tub ready to enjoy!

_edited.jpg)



Comments